logo

BRIDGES AND
TUNNELS OF
ALLEGHENY COUNTY,
PENNSYLVANIA

Introduction
List by Location
List by Design
List by Name
List by Use

Search This Site

Article Index

Frederick Law
Olmsted
report to the
Pittsburgh Civic Commission

"Pittsburgh:
Main Thoroughfares and The
Down Town District"
1910

00 Cover Page

00 Contents

01 Down Town
   District

02 Main
   Thoroughfares

03 Surveys and
   a City Plan

04 Parks and
   Recreation
   Facilities

05 Special
   Reports

06 Index


PART V: Special Reports
The City and The Allegheny River Bridges

Pittsburgh: Main Thoroughfares and The Down Town District
Frederick Law Olmsted report to The Pittsburgh Civic Commission, 1910


page 134

Contents : Previous : Next


2. That the Ninth Street bridge should be rebuilt as soon as practicable with a central pier and two wide spans conforming to those of the Sixth Street and Seventh Street bridges. The design of the new Ninth Street bridge, however, should not be finally determined and erection begun until a definite plan for comprehensive improvements in the traction system between the two sides of the river has been decided upon. Unless new circumstances develop before the construction of this bridge is begun that materially affect the problem of clearance height, the elevation should be fixed in accordance with the closing paragraph below.

3. That all questions pertaining to changing the elevation of the Sixth Street, Seventh Street, Fort Wayne, Thirtieth Street and Junction Railroad bridges be deferred to await the report of the Pittsburgh Flood Commission and the resultant action; to await the report on a comprehensive plan for traction improvements; to await the completion of the work projected by the City in cutting down some streets and filling others; and to await the results of the investigation of river boat design and construction provided for in the River and Harbor bill just passed by Congress.

4. That if it is deemed essential and necessary at present to decide upon the elevation to which all Allegheny River bridges must be made to conform, this elevation be fixed so that there shall be a clear head room of substantially 37 feet above pool level, varied so as to give at each bridge a clear head room of 28 feet when the river is at a 15 foot flood stage. This height to be maintained over the entire main span where there is a central span and for 180 feet on each side of the central pier where there is a central pier.

FULL REPORT

April 19th, 1910
THE PITTSBURGH CIVIC COMMISSION:

Gentlemen: In accordance with your expressed desire we have examined into the bridge problem on the Allegheny River now before the City, particularly in regard to the use of the bridges and their connections with the streets of the city and the use of the river for harbor and navigation purposes, and beg to submit the following report thereon:


Contents : Previous : Next